Project Spark

BASF Ucrete DP resin flooring application was completed in the production area for the new Wine Brewing Area 960m². The Topcoat team collaborated with Calder Stuart on works including 300mm high coving, Mastertop 1080 Epoxy coating to block walls and the placement of Masterseal CR435, a heat resistant Polyurea jointing system. Stage 2 of the project included Ucrete DP (985m2), acid resistant coatings and Sika Curehard densifier application.

Stage 2 – which will include Ucrete DP – (985m2), acid resistant coatings and Sika Curehard densifier application.